Better Bridgeway
·Written By Aaron Roller

Proposal & Meeting

Official Meeting Documents from March 29th, 2025

Council Decision (March 29, 2025): Shelved, Not Dead

After a four-hour special meeting, the Sausalito City Council voted not to accept the $504,600 MTC grant that would have built this design, and the money went back to MTC. Instead, the council asked staff to explore flashing-beacon crosswalks, a loading zone at the Trident dock, more signage, a 20 mph speed limit and stronger enforcement against parking in the center lane (SFGate). The entire Pedestrian and Bicycle Advisory Committee resigned in protest.

The engineering is finished and paid for. Bridgeway still needs repaving and is still on Marin County’s High Collision Network, and the crashes haven’t stopped. This design is ready when Sausalito is. For the city’s slower, crosswalk-only follow-up, see Crosswalks.

Crosswalks, Bike Lanes, Curbside Delivery

A professional design provided by Parametrix proposes bike lanes as a solution to reducing congestion while improving safety. Read the slides or watch the video.

Bike lanes and Loading zones for commercial delivery at the curbside. See more about Curbside Delivery.

Bike Lanes on Both Sides

A standard roadway design with Class II bike lanes separating traffic.

Read more about how the Southbound bicycle lane can avoid The Door Zone.

Crosswalks for Pedestrians

Crosswalks were proposed at Trident and another at Golden Gate Market. See the page for the updated design since the presentation. After the council shelved this design, the city started a separate, much slower Bridgeway Pedestrian Crossing Project (Princess St. to Second St.) to study crosswalks on their own. More details. See also Crosswalks make a Better Bridgeway.

Existing parking would have been repurposed as restricted parking. Large trucks would enter from Marin City and exit via Alexander. More details.

Dining parklets remain with this recommendation.

Delivery drivers should enter Sausalito from Marin City Hwy 101 exit. Those that arrive from Alexander should turn around near Sausalito Center for Arts. More details.

See more about history of Curbside Delivery.

$505,000 Grant (Declined and Returned to MTC)

See the Draft Staff Report and Grants

Aaron Roller